{"id":53841,"date":"2025-12-03T03:18:13","date_gmt":"2025-12-03T03:18:13","guid":{"rendered":"https:\/\/aacblockmanufacturingplant.com\/?p=53841"},"modified":"2026-04-16T05:02:58","modified_gmt":"2026-04-16T05:02:58","slug":"aac-block-line-in-ethiopia","status":"publish","type":"post","link":"https:\/\/aacblockmanufacturingplant.com\/de\/aac-block-line-in-ethiopia\/","title":{"rendered":"AAC Block Line in Ethiopia"},"content":{"rendered":"<div>\n<div class=\"gb-element-61a66b34\">\n<div class=\"gb-element-0e4a4de7\">\n<h2 class=\"gb-text\"><strong>70,000 m\u00b3\/Year<\/strong> AAC Block Line in Ethiopia<\/h2>\n\n\n\n<p>In September 2024, we successfully delivered, installed, and commissioned a&nbsp;<strong>70,000 m\u00b3\/year AAC Block Manufacturing Line<\/strong>&nbsp;to Ethiopia\u2014marking our strategic entry into East Africa\u2019s fast-evolving construction sector.&nbsp;<\/p>\n\n\n\n<div class=\"gb-element-3cdae87e\">\n<div class=\"gb-element-f5c820f5\">\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Country<\/td><td>Ethiopia (Addis Ababa Industrial Zone)<\/td><\/tr><tr><td>Annual Production Capacity<\/td><td>70,000 m\u00b3 (Classified as&nbsp;<strong>Mini-AAC-Anlage<\/strong>\u2014aligned with Ethiopia\u2019s local demand)<\/td><\/tr><tr><td>Plant Type<\/td><td>Semi-Automatic Mini AAC Block Manufacturing Line<\/td><\/tr><tr><td>Client Type<\/td><td>Ethiopian building material distributor expanding into eco-friendly block production<\/td><\/tr><tr><td>Service Provided<\/td><td>Full turnkey solution (Custom Design + Equipment Supply + On-site Installation + Operator Training + 18-Month After-Sales Support)<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div>\n\n\n\n<div><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"http:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/11\/aac-block-plant-cost.jpg\" alt=\"aac block Anlage Kosten\" class=\"wp-image-53587\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/11\/aac-block-plant-cost.jpg 800w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/11\/aac-block-plant-cost-300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/11\/aac-block-plant-cost-768x576.jpg 768w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/11\/aac-block-plant-cost-16x12.jpg 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/div>\n\n\n<div class=\"gb-element-98524277\">\n<div class=\"gb-element-6fbdb318\">\n<div class=\"gb-element-94c05f1d\">\n<a class=\"gb-button gb-button-b9bb980a\" href=\"https:\/\/aacblockmanufacturingplant.com\/de\/\"><span class=\"gb-button-text\">Alle AAC-Anlagen anzeigen<\/span><span class=\"gb-icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewbox=\"0 0 512 512\" width=\"1em\" height=\"1em\" aria-hidden=\"true\"><path d=\"M440 6.5L24 246.4c-34.4 19.9-31.1 70.8 5.7 85.9L144 379.6V464c0 46.4 59.2 65.5 86.6 28.6l43.8-59.1 111.9 46.2c5.9 2.4 12.1 3.6 18.3 3.6 8.2 0 16.3-2.1 23.6-6.2 12.8-7.2 21.6-20 23.9-34.5l59.4-387.2c6.1-40.1-36.9-68.8-71.5-48.9zM192 464v-64.6l36.6 15.1L192 464zm212.6-28.7l-153.8-63.5L391 169.5c10.7-15.5-9.5-33.5-23.7-21.2L155.8 332.6 48 288 464 48l-59.4 387.3z\" fill=\"currentColor\"><\/path><\/svg><\/span><\/a>\n<\/div>\n\n\n\n<div class=\"gb-element-9bf3fda6\">\n<a class=\"gb-button gb-button-4aada12e gb-button-text\" href=\"#popmake-52018\">Anpassen der Kosten<\/a>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-afd8d659\">\n<div class=\"gb-element-f79c562c\">\n<h2 class=\"gb-text\">Why the Ethiopian Client Chose a 70,000 m\u00b3\/Year AAC Line?<\/h2>\n\n\n\n<p>Our client\u2014an established distributor of concrete blocks and cement in Addis Ababa\u2014wanted to expand into high-demand AAC blocks but faced constraints like limited initial investment and small land size. The 70,000 m\u00b3\/year mini plant was the ideal choice for three core reasons:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Market Alignment<\/strong>: Addis Ababa\u2019s construction sector demands 60,000\u201380,000 m\u00b3 of AAC blocks annually (2024 industry data). The 70,000 m\u00b3 capacity ensures the client can meet local demand without overinvesting in unused production.<\/li>\n\n\n\n<li><strong>Cost-Efficiency<\/strong>: At ~780,000 USD, the setup cost fits the client\u2019s budget for expansion. The plant also requires only 10 workers per shift (vs. 15+ for medium-scale lines), lowering ongoing labor expenses.<\/li>\n\n\n\n<li><strong>Skalierbarkeit<\/strong>: We designed the line with future expansion in mind\u2014key components (e.g., autoclaves, batching systems) can be upgraded to 120,000 m\u00b3\/year within 12 months if demand grows, avoiding the need for a full plant rebuild.<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-ea65d99a\">\n<div class=\"gb-element-f64df556\">\n<h2 class=\"gb-text\">Detailed Equipment Configuration for AAC Block Line in Ethiopia<\/h2>\n\n\n\n<p>To ensure optimal performance in Ethiopia\u2019s unique conditions (e.g., local raw material properties, power voltage), we customized the production line with high-quality, durable equipment. Below is the full breakdown of machinery, tailored to meet Ethiopia\u2019s building standards (ES 1183:2018 for AAC blocks):<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th><strong>Equipment Category<\/strong><\/th><th><strong>Specific Machinery<\/strong><\/th><th><strong>Customization for Ethiopia<\/strong><\/th><th><strong>Funktion<\/strong><\/th><\/tr><\/thead><tbody><tr><td><strong>Verarbeitung von Rohstoffen<\/strong><\/td><td>Backenbrecher <\/td><td>Adjusted crushing gap (50mm) to process Ethiopia\u2019s hard limestone <\/td><td>Crushes limestone, gypsum, and lime into coarse powder (\u22645mm) for grinding.<\/td><\/tr><tr><td><\/td><td>Ball Mill (Model: \u03a61.8m \u00d7 4.5m)<\/td><td>Equipped with high-wear-resistant liners to handle Ethiopia\u2019s high-silica river sand.<\/td><td>Grinds raw materials (fly ash, limestone) into fine powder (80% passing 200-mesh sieve) for uniform slurry.<\/td><\/tr><tr><td><\/td><td>Bucket Elevator <\/td><td>Reinforced belt to withstand dusty Ethiopian workshop conditions; speed calibrated for steady material flow.<\/td><td>Transports powdered raw materials (lime, cement) from crushers to storage silos.<\/td><\/tr><tr><td><\/td><td>Storage Silos (3 units: 50m\u00b3 each for cement, lime, fly ash)<\/td><td>Fitted with level sensors and dust-collection systems <\/td><td>Stores raw materials safely, preventing moisture absorption and dust pollution.<\/td><\/tr><tr><td><strong>Dosieren und Mischen<\/strong><\/td><td>Automatic Batching System <\/td><td>Calibrated for Ethiopia\u2019s fly ash to maintain block strength (\u22653.0 MPa).<\/td><td>Precisely measures raw materials for consistent slurry quality.<\/td><\/tr><tr><td><\/td><td>Slurry Mixing Tank <\/td><td>Low-speed agitator (30 RPM) to prevent sedimentation of Ethiopia\u2019s dense river sand slurry.<\/td><td>Mixes fly ash\/sand with water to form homogeneous slurry.<\/td><\/tr><tr><td><\/td><td>Pouring Mixer <\/td><td>Stainless steel inner lining to resist corrosion from Ethiopia\u2019s slightly acidic water.<\/td><td>Mixes slurry with aluminum powder (foaming agent) to create aerated mixture for casting.<\/td><\/tr><tr><td><strong>Molding &amp; Pre-Curing<\/strong><\/td><td>AAC Mold (Size: 6.0m \u00d7 1.2m \u00d7 0.6m)<\/td><td>Detachable side plates for easy demolding; coated with non-stick material to reduce block damage.<\/td><td>Holds aerated slurry during pre-curing (4\u20136 hours at 40\u201350\u00b0C) to form \u201cgreen cakes\u201d (semi-solid blocks).<\/td><\/tr><tr><td><\/td><td>F\u00e4hrwagen <\/td><td>Battery-powered (vs. electric) to handle occasional power outages in Addis Ababa.<\/td><td>Transports molds from pouring area to pre-curing rooms and then to cutting stations.<\/td><\/tr><tr><td><\/td><td>Pre-Curing Room (2 units: 20m \u00d7 8m each)<\/td><td>Insulated walls and solar-assisted heating to reduce diesel use.<\/td><td>Maintains stable temperature\/humidity for pre-curing, ensuring green cakes reach required hardness (\u22651.5 MPa).<\/td><\/tr><tr><td><strong>Schneiden<\/strong><\/td><td>Vertical Cutting Machine <\/td><td>Small-scale design with manual adjustment for Ethiopia\u2019s standard block sizes (600\u00d7200\u00d7100\/150\/200mm).<\/td><td>Cuts green cakes into final block dimensions with high precision (tolerance: \u00b12mm).<\/td><\/tr><tr><td><strong>Autoclaving (Key Component)<\/strong><\/td><td>Autoclave (2 units: \u03a62.0m \u00d7 26m)<\/td><td>Fueled by biomass (locally available sugarcane bagasse) instead of diesel\u2014lowers energy costs by 35%.<\/td><td>Applies high-temperature steam (190\u00b0C, 1.2MPa) for 8 hours to strengthen blocks, ensuring compliance with ES 1183:2018.<\/td><\/tr><tr><td><\/td><td>Dampfkessel <\/td><td>Modified to use biomass fuel; equipped with water treatment system to handle Ethiopia\u2019s hard water.<\/td><td>Generates high-pressure steam for autoclaves; reduces scale buildup (common in Ethiopian water) to extend boiler life.<\/td><\/tr><tr><td><strong>Finished Block Handling<\/strong><\/td><td>Block Separator <\/td><td>Gentle separation mechanism to avoid chipping\u2014critical for Ethiopia\u2019s demand for high-quality blocks.<\/td><td>Separates bonded finished blocks (post-autoclaving) into individual units.<\/td><\/tr><tr><td><\/td><td>Semi-Automatic Packing Machine <\/td><td>Manual feeding option (for small-batch orders) and automatic wrapping (for large orders to housing projects).<\/td><td>Packages blocks into 10-unit bundles; uses recyclable plastic film.<\/td><\/tr><\/tbody><\/table><\/figure>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-113e25a3\">\n<div class=\"gb-element-f7ded026\">\n<h2 class=\"gb-text\">Export Process of AAC Block Line in Ethiopia<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Pre-Production Preparation<\/strong>:\n<ul class=\"wp-block-list\">\n<li>Tested 4 batches of Ethiopian fly ash (from Finchaa Power Plant) and river sand (from Blue Nile) to optimize the slurry formula\u2014ensuring block strength and density meet local standards.<\/li>\n\n\n\n<li>Customized block sizes to match Ethiopia\u2019s common construction dimensions (600\u00d7200\u00d7100mm for interior walls, 600\u00d7200\u00d7200mm for exterior walls).<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Manufacturing &amp; Quality Checks<\/strong>:\n<ul class=\"wp-block-list\">\n<li>38-day equipment production cycle, with 2 weekly video inspections by the client (to confirm progress and address questions).<\/li>\n\n\n\n<li>Conducted dry runs (using simulated Ethiopian raw materials) and load tests for all machinery\u2014ensuring no defects before shipment.<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Shipping &amp; Documentation<\/strong>:\n<ul class=\"wp-block-list\">\n<li>Shipped via&nbsp;<strong>Djibouti Port<\/strong>&nbsp;(Ethiopia\u2019s main trade gateway) using 8\u00d740HQ containers; arranged inland transport (truck) to Addis Ababa (5-day journey).<\/li>\n\n\n\n<li>Prepared all required documents: Certificate of Origin (COO, authenticated by Ethiopian Embassy), Ethiopian Standards Agency (ESA) import approval, packing list, commercial invoice, and bill of lading.<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-607a2de8\">\n<div class=\"gb-element-2bf9c247\">\n<h2 class=\"gb-text\">On-Site Installation &amp; Operator Training<\/h2>\n\n\n\n<p>Our 5-person engineering team spent 30 days on-site in Addis Ababa to ensure seamless setup and knowledge transfer:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Mechanical Installation (18 days)<\/strong>: Assembled all equipment, with adjustments for Ethiopia\u2019s 230V\/50Hz power supply. We also reinforced the autoclave foundation to handle Addis Ababa\u2019s clay soil.<\/li>\n\n\n\n<li><strong>Electrical Setup (7 days)<\/strong>: Installed a PLC control system with a user-friendly interface (translated into Amharic) and added backup generators to mitigate power outages.<\/li>\n\n\n\n<li><strong>Operator Training (5 days)<\/strong>: Trained 10 local workers on:\n<ul class=\"wp-block-list\">\n<li>Safe operation of high-risk equipment (autoclaves, ball mills) per Ethiopian labor laws (FDRE Labor Proclamation No. 1156\/2019).<\/li>\n\n\n\n<li>Troubleshooting common issues (e.g., slurry inconsistency, steam pressure drops) with hands-on practice.<\/li>\n\n\n\n<li>Quality control: Testing block density (550\u2013650 kg\/m\u00b3), compressive strength, and dimensions using ESA-approved tools.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p>By the end of training, all workers could operate the line independently\u2014fulfilling the client\u2019s goal of building a skilled local team.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-50145579\">\n<div class=\"gb-element-ac9f3c7c\">\n<h2 class=\"gb-text\">Post-Commissioning Performance<\/h2>\n\n\n\n<p>One month after launch, the <a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/aac-production-line\/\">AAC block line<\/a> exceeded the client\u2019s expectations, meeting all performance targets:<\/p>\n\n\n\n<div class=\"gb-element-d9c226b2\">\n<div class=\"gb-element-973a3ff5\"><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"http:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/Autoclave.jpg\" alt=\"Autoclave of aac block manufactuing plant\" class=\"wp-image-51770\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/Autoclave.jpg 800w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/Autoclave-300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/Autoclave-768x576.jpg 768w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/Autoclave-16x12.jpg 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/div><\/div>\n\n\n\n<div>\n<ul class=\"wp-block-list\">\n<li><strong>T\u00e4glicher Output<\/strong>: 190\u2013210 m\u00b3 (consistent with 70,000 m\u00b3\/year capacity).<\/li>\n\n\n\n<li><strong>Block Quality<\/strong>: 96.5% qualification rate (meets ES 1183:2018); compressive strength (3.2 MPa), density (580 kg\/m\u00b3), and thermal insulation (0.14 W\/mK) all above industry averages.<\/li>\n\n\n\n<li><strong>Energie-Effizienz<\/strong>: Uses 28% less fuel than the client\u2019s previous concrete block line (thanks to biomass-powered autoclaves and solar pre-curing).<\/li>\n\n\n\n<li><strong>Market Success<\/strong>: The client secured contracts to supply AAC blocks to 3 affordable housing projects in Addis Ababa and 1 hotel construction site in Bahir Dar\u2014generating revenue within the first 6 weeks.<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-2b58ef80\">\n<div class=\"gb-element-7ad65dbf\">\n<h2 class=\"gb-text\">What Our Client Says?<\/h2>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>\u201cWe were nervous about switching to AAC production\u2014no one in our region had done it before,\u201d said Mr. Alemayehu, the client\u2019s operations director. \u201cThis team changed that: they tested our local fly ash, trained our workers in Amharic, and even helped us get ESA approval. The line runs smoothly, and our orders are already growing. In 2 years, we\u2019ll upgrade to 120,000 m\u00b3\/year\u2014and we\u2019ll only work with them.\u201d<\/p>\n<\/blockquote>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-cf53c6d7\">\n<div class=\"gb-element-e3c16ffc\">\n<div class=\"gb-element-ad9f6963\">\n<div>\n<h2 class=\"gb-text\"><strong><strong><strong>Warum uns w\u00e4hlen<\/strong><\/strong><\/strong>?<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Local Expertise<\/strong>: We understand Ethiopia\u2019s raw materials (e.g., high-silica sand, low-carbon fly ash), regulations (ESA standards, labor laws), and logistics (Djibouti Port, inland transport).<\/li>\n\n\n\n<li><strong>Turnkey Reliability<\/strong>: From feasibility studies to post-launch maintenance, we handle every step\u2014no hidden costs or delays.<\/li>\n\n\n\n<li><strong>Nachgewiesene Erfolgsbilanz<\/strong>: We\u2019ve supplied 8+ AAC lines to East Africa (Kenya, Tanzania, Ethiopia), with 95% of clients achieving ROI within 2 years.<\/li>\n\n\n\n<li><strong>Equipment Durability<\/strong>: All machinery uses high-wear components (e.g., reinforced ball mill liners) to withstand Ethiopia\u2019s harsh workshop conditions\u2014backed by a 5-year warranty on core parts.<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div class=\"gb-element-756ac3ef\"><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"http:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/Technical-Support-Upgrades.jpg\" alt=\"\" class=\"wp-image-52291\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/Technical-Support-Upgrades.jpg 800w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/Technical-Support-Upgrades-300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/Technical-Support-Upgrades-768x576.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-a84e3cb9\">\n<div class=\"gb-element-a969ae5d\">\n<h2 class=\"gb-text\"><strong><strong><strong><strong><strong>Start Your AAC Block Manufacturing Plant<\/strong><\/strong><\/strong><\/strong><\/strong>?<\/h2>\n\n\n\n<p>Whether you are planning a <strong>klein<\/strong>, <strong>medium<\/strong>, oder <strong>large-scale AAC factory<\/strong>, we can provide complete solutions based on your land, budget, and market demand.<\/p>\n\n\n\n<p><strong>Contact us now to get a free feasibility study &amp; detailed quotation.<\/strong> Our engineers will design the most<a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/\"> suitable AAC plants<\/a> for your needs.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-593bf62b\">\n<div class=\"gb-element-bf4f386e\">\n<h2 class=\"gb-text\"><strong><strong><strong><strong><strong>Zugeh\u00f6rige AAC-Anlage<\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n\n\n\n<div><div class=\"pt-cv-wrapper\"><div class=\"pt-cv-view pt-cv-grid pt-cv-colsys\" id=\"pt-cv-view-82d662b0bf\"><div data-id=\"pt-cv-page-1\" class=\"pt-cv-page\" data-cvc=\"3\"><div class=\"col-md-4 col-sm-6 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/aac-block-making-machine\/\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img decoding=\"async\" width=\"300\" height=\"225\" src=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/100000-m\u00b3-AAC-block-plant-300x225.jpg\" class=\"pt-cv-thumbnail\" alt=\"kleine 100.000 m\u00b3 AAC-Blockanlage\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/100000-m\u00b3-AAC-block-plant-300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/100000-m\u00b3-AAC-block-plant-768x576.jpg 768w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/100000-m\u00b3-AAC-block-plant-16x12.jpg 16w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/100000-m\u00b3-AAC-block-plant.jpg 800w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/aac-block-making-machine\/\" class=\"_self\" target=\"_self\" >AAC Block Making Machine<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-4 col-sm-6 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/aac-blocks-manufacturing-machinery\/\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img decoding=\"async\" width=\"300\" height=\"225\" src=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/300000-m\u00b3-AAC-block-plant-300x225.webp\" class=\"pt-cv-thumbnail\" alt=\"Hochwertige 300.000 m\u00b3 AAC-Blockanlage\" srcset=\"\" sizes=\"(max-width: 300px) 100vw, 300px\" data-srcset=\"\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/aac-blocks-manufacturing-machinery\/\" class=\"_self\" target=\"_self\" >Maschinen zur Herstellung von AAC-Bl\u00f6cken<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-4 col-sm-6 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/small-aac-block-plant\/\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img decoding=\"async\" width=\"300\" height=\"225\" src=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/50000-m\u00b3-AAC-block-plant-300x225.jpg\" class=\"pt-cv-thumbnail\" alt=\"50.000 m\u00b3 AAC-Blockanlage in kleinem Ma\u00dfstab\" srcset=\"\" sizes=\"(max-width: 300px) 100vw, 300px\" data-srcset=\"\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/small-aac-block-plant\/\" class=\"_self\" target=\"_self\" >Kleine AAC-Blockanlage<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-4 col-sm-6 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/autoclaved-aerated-concrete-aac-plant\/\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img decoding=\"async\" width=\"300\" height=\"225\" src=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/200000-m\u00b3-AAC-block-plant-300x225.jpg\" class=\"pt-cv-thumbnail\" alt=\"200.000 m\u00b3 AAC-Blockanlage zu verkaufen\" srcset=\"\" sizes=\"(max-width: 300px) 100vw, 300px\" data-srcset=\"\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/autoclaved-aerated-concrete-aac-plant\/\" class=\"_self\" target=\"_self\" >Autoklavierter Porenbeton AAC-Anlage<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-4 col-sm-6 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/aac-block-manufacturing-plant\/\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img decoding=\"async\" width=\"300\" height=\"225\" src=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-lintels-and-blocks-with-grooves-300x225.jpg\" class=\"pt-cv-thumbnail\" alt=\"AAC Block Produktionslinie zu verkaufen\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-lintels-and-blocks-with-grooves-300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-lintels-and-blocks-with-grooves-768x576.jpg 768w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-lintels-and-blocks-with-grooves.jpg 800w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/aac-block-manufacturing-plant\/\" class=\"_self\" target=\"_self\" >AAC Block Fertigungsanlage<\/a><\/h4><\/div><\/div>\n<div class=\"col-md-4 col-sm-6 col-xs-12 pt-cv-content-item pt-cv-1-col\" ><div class='pt-cv-ifield'><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/aac-block-plant\/\" class=\"_self pt-cv-href-thumbnail pt-cv-thumb-default\" target=\"_self\" ><img decoding=\"async\" width=\"300\" height=\"225\" src=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/AAC-blcok-plant-manufacturer-and-supplier-300x225.jpg\" class=\"pt-cv-thumbnail\" alt=\"Hersteller und Lieferant einer AAC-Blockanlage\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/AAC-blcok-plant-manufacturer-and-supplier-300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/AAC-blcok-plant-manufacturer-and-supplier-768x576.jpg 768w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/AAC-blcok-plant-manufacturer-and-supplier-16x12.jpg 16w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/AAC-blcok-plant-manufacturer-and-supplier.jpg 800w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\n<h4 class=\"pt-cv-title\"><a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/aac-block-plant\/\" class=\"_self\" target=\"_self\" >AAC Block Plant<\/a><\/h4><\/div><\/div><\/div><\/div><\/div><\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-b969ba1a\">\n<div class=\"gb-element-52742007\">\n<p>This project in Ethiopia is part of our broader <a href=\"https:\/\/aacblockmanufacturingplant.com\/de\/aac-block-plant-projects-in-africa\/\">AAC block plant installations across Africa<\/a>, including Ghana, Kenya, Tanzania, and other fast-growing markets.<\/p>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>70,000 m\u00b3\/Year AAC Block Line in Ethiopia In September 2024, we successfully delivered, installed, and commissioned a&nbsp;70,000 m\u00b3\/year AAC Block Manufacturing Line&nbsp;to Ethiopia\u2014marking our strategic entry into East Africa\u2019s fast-evolving &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"AAC Block Line in Ethiopia\" class=\"read-more button\" href=\"https:\/\/aacblockmanufacturingplant.com\/de\/aac-block-line-in-ethiopia\/#more-53841\" aria-label=\"Mehr Informationen \u00fcber AAC Block Line in Ethiopia\">Weiterlesen ...<\/a><\/p>","protected":false},"author":1,"featured_media":53587,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[],"class_list":["post-53841","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cases","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-50","no-featured-image-padding"],"_links":{"self":[{"href":"https:\/\/aacblockmanufacturingplant.com\/de\/wp-json\/wp\/v2\/posts\/53841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aacblockmanufacturingplant.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aacblockmanufacturingplant.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aacblockmanufacturingplant.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aacblockmanufacturingplant.com\/de\/wp-json\/wp\/v2\/comments?post=53841"}],"version-history":[{"count":0,"href":"https:\/\/aacblockmanufacturingplant.com\/de\/wp-json\/wp\/v2\/posts\/53841\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aacblockmanufacturingplant.com\/de\/wp-json\/wp\/v2\/media\/53587"}],"wp:attachment":[{"href":"https:\/\/aacblockmanufacturingplant.com\/de\/wp-json\/wp\/v2\/media?parent=53841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aacblockmanufacturingplant.com\/de\/wp-json\/wp\/v2\/categories?post=53841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aacblockmanufacturingplant.com\/de\/wp-json\/wp\/v2\/tags?post=53841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}