{"id":55077,"date":"2026-04-21T02:18:41","date_gmt":"2026-04-21T02:18:41","guid":{"rendered":"https:\/\/aacblockmanufacturingplant.com\/?p=55077"},"modified":"2026-04-21T02:19:15","modified_gmt":"2026-04-21T02:19:15","slug":"aac-blocks-manufacturing-unit-cost","status":"publish","type":"post","link":"https:\/\/aacblockmanufacturingplant.com\/pt\/aac-blocks-manufacturing-unit-cost\/","title":{"rendered":"AAC Blocks Manufacturing Unit Cost"},"content":{"rendered":"<div>\n<div class=\"gb-element-61a66b34\">\n<div class=\"gb-element-0e4a4de7\">\n<div class=\"gb-element-87c252db\">\n<div>\n<h2 class=\"gb-text\">Complete Investment Guide<\/h2>\n\n\n\n<p>Setting up an AAC (Autoclaved Aerated Concrete) block manufacturing unit is one of the most promising opportunities in the modern construction materials industry. With rising demand for lightweight, energy-efficient, and eco-friendly building materials, AAC plants are becoming increasingly attractive for investors worldwide.<\/p>\n\n\n\n<p>However, one of the most critical questions remains: <strong>how much does it really cost to start an AAC blocks manufacturing unit?<\/strong><br>This guide breaks it down in a practical, investor-focused way\u2014so you can make decisions, not just read theory. reduces coordination risk and ensures the plant is delivered as a complete, working system rather than a collection of separate components.<\/p>\n<\/div>\n\n\n\n<div>\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"http:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2026\/02\/aac-block-manufacturing-machine-price.jpg\" alt=\"AAC Blocks Manufacturing Unit Cost\" class=\"wp-image-54434\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2026\/02\/aac-block-manufacturing-machine-price.jpg 800w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2026\/02\/aac-block-manufacturing-machine-price-300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2026\/02\/aac-block-manufacturing-machine-price-768x576.jpg 768w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2026\/02\/aac-block-manufacturing-machine-price-16x12.jpg 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n<div class=\"gb-container gb-container-5a968408\"><a class=\"gb-container-link\" href=\"#popmake-52018\"><\/a>\n\n<span class=\"gb-button gb-button-bc7a6856 gb-button-text\">Get Your AAC Block Project Cost<\/span>\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-f90673d6\">\n<div class=\"gb-element-f78bfae9\">\n<h2 class=\"gb-text\">Cost of Small-Scale AAC Unit<\/h2>\n\n\n\n<p>A small-scale AAC block manufacturing unit is typically designed for new investors or regional suppliers entering the market.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Typical Capacity<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>20,000\u201350,000 m\u00b3 per year<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Estimated Investment Range<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Cost Component<\/th><th>Estimated Cost (USD)<\/th><\/tr><\/thead><tbody><tr><td>Land &amp; Civil Work<\/td><td>$50,000 \u2013 $150,000<\/td><\/tr><tr><td>Machinery &amp; Equipment<\/td><td>$250,000 \u2013 $500,000<\/td><\/tr><tr><td>Installation &amp; Commissioning<\/td><td>$30,000 \u2013 $80,000<\/td><\/tr><tr><td>Raw Materials (Initial)<\/td><td>$20,000 \u2013 $50,000<\/td><\/tr><tr><td>Labor &amp; Utilities Setup<\/td><td>$10,000 \u2013 $30,000<\/td><\/tr><tr><td><strong>Investimento total<\/strong><\/td><td><strong>$360,000 \u2013 $810,000<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">What This Means in Practice<\/h3>\n\n\n\n<p>If you&#8217;re starting from scratch, a <strong>$400K\u2013$600K budget<\/strong> is usually sufficient for a stable small AAC plant.<\/p>\n\n\n\n<p><strong>Action insight:<\/strong><br>Start with a smaller capacity but ensure your layout allows future expansion. Many investors underestimate how quickly demand scales once distribution channels are established.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-c6d6e64e\">\n<div class=\"gb-element-c6b4fc84\">\n<h2 class=\"gb-text\">Our Cases of AAC Blocks Manufacturing Unit Cost<\/h2>\n\n\n\n<p>Real-world projects provide a much clearer understanding of AAC plant investment than theoretical estimates. Below are two 20,000 m\u00b3\/year AAC block manufacturing units we delivered, with a focus on <strong>cost structure and investment strategy<\/strong>.<\/p>\n\n\n\n<div class=\"gb-element-76575e98\">\n<div><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"http:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-plant-exported-to-Nigeria.jpg\" alt=\"AAC plant exported to Nigeria\" class=\"wp-image-51991\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-plant-exported-to-Nigeria.jpg 800w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-plant-exported-to-Nigeria-300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-plant-exported-to-Nigeria-768x576.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"gb-text gb-text-eb1b9c57\"><strong><a href=\"https:\/\/aacblockmanufacturingplant.com\/pt\/20000-m3-year-aac-block-manufacturing-plant-in-nigeria\/\">Nigeria Project (20,000 m\u00b3\/year)<\/a><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Plant Type<\/strong>: Semi-automatic AAC production line <\/li>\n\n\n\n<li><strong>Investimento total<\/strong>: Approx. <strong>$420,000 \u2013 $550,000<\/strong><\/li>\n\n\n\n<li><strong>Market Context<\/strong>: High demand, limited local competition<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div>\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Cost Category<\/th><th>Percentage<\/th><\/tr><\/thead><tbody><tr><td>Equipamento<\/td><td>60%<\/td><\/tr><tr><td>Civil Construction<\/td><td>20%<\/td><\/tr><tr><td>Installation &amp; Commissioning<\/td><td>10%<\/td><\/tr><tr><td>Initial Working Capital<\/td><td>10%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Cost Strategy<\/h4>\n\n\n\n<p>This project achieved a relatively low investment level due to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Lower labor costs<\/strong>, allowing reduced automation<\/li>\n\n\n\n<li><strong>Local raw material sourcing<\/strong>, minimizing logistics expenses<\/li>\n\n\n\n<li><strong>Simplified equipment configuration<\/strong>, avoiding unnecessary upgrades<\/li>\n<\/ul>\n\n\n\n<p><strong>Outcome:<\/strong><br>The plant reached stable production quickly and achieved a <strong>payback period of around 2 years<\/strong>, driven by strong local demand.<\/p>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<div class=\"gb-element-09898d0d\">\n<div><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"http:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-panels-plant-in-India.jpg\" alt=\"AAC panels plant in India\" class=\"wp-image-51995\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-panels-plant-in-India.jpg 800w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-panels-plant-in-India-300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/08\/AAC-panels-plant-in-India-768x576.jpg 768w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"gb-text gb-text-eb358fb9\"><strong><a href=\"https:\/\/aacblockmanufacturingplant.com\/pt\/20000-cubic-meters-aac-block-plant-for-egypt\/\">Egypt Project (20,000 m\u00b3\/year)<\/a><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Plant Type<\/strong>: Optimized semi-automatic AAC line <\/li>\n\n\n\n<li><strong>Investimento total<\/strong>: Approx. <strong>$500,000 \u2013 $700,000<\/strong><\/li>\n\n\n\n<li><strong>Market Context<\/strong>: More competitive, higher quality expectations<\/li>\n<\/ul>\n<\/div>\n\n\n\n<div>\n<p>Projects like this highlight the importance of <strong>custom engineering<\/strong>, not just equipment supply. The ability to adapt to local conditions is often what determines long-term success.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Cost Category<\/th><th>Percentage<\/th><\/tr><\/thead><tbody><tr><td>Equipamento<\/td><td>65%<\/td><\/tr><tr><td>Civil Construction<\/td><td>15%<\/td><\/tr><tr><td>Automation Upgrades<\/td><td>10%<\/td><\/tr><tr><td>Installation &amp; Other<\/td><td>10%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h4 class=\"wp-block-heading\">Cost Strategy<\/h4>\n\n\n\n<p>Compared to the Nigeria project, this plant required higher investment due to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Upgraded cutting and handling systems<\/strong> for better precision<\/li>\n\n\n\n<li><strong>Improved product consistency<\/strong>, meeting stricter market standards<\/li>\n\n\n\n<li><strong>Reduced long-term labor dependency<\/strong> through partial automation<\/li>\n<\/ul>\n\n\n\n<p><strong>Outcome:<\/strong><br>Although the initial investment was higher, the plant benefits from:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>More consistent product quality<\/li>\n\n\n\n<li>Stronger competitiveness in a mature market<\/li>\n\n\n\n<li>Lower operational costs over time<\/li>\n<\/ul>\n<\/div>\n<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-972805ce\">\n<div class=\"gb-element-ec084668\">\n<h2 class=\"gb-text\">Semi-Automatic vs Manual Unit Cost<\/h2>\n\n\n\n<p>Choosing the right production mode directly impacts both your investment and long-term profitability.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Cost Comparison<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Tipo<\/th><th>Investment<\/th><th>Necessidade de m\u00e3o de obra<\/th><th>Output Stability<\/th><th>Recommended For<\/th><\/tr><\/thead><tbody><tr><td>Manual<\/td><td>$200K \u2013 $400K<\/td><td>High<\/td><td>Low<\/td><td>Very small\/local markets<\/td><\/tr><tr><td>Semi-Autom\u00e1tico<\/td><td>$400K \u2013 $800K<\/td><td>M\u00e9dio<\/td><td>High<\/td><td>Most investors<\/td><\/tr><tr><td>Fully Automatic<\/td><td>$1M+<\/td><td>Low<\/td><td>Very High<\/td><td>Large-scale industrial production<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\">Practical Recommendation<\/h3>\n\n\n\n<p>Manual plants may seem cheaper upfront, but they often create problems:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Inconsistent quality<\/li>\n\n\n\n<li>High labor dependency<\/li>\n\n\n\n<li>Limited scalability<\/li>\n<\/ul>\n\n\n\n<p><strong>Action insight:<\/strong> For most first-time investors, <strong>semi-automatic lines offer the best balance<\/strong> between cost, efficiency, and scalability.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-1d240202\">\n<div class=\"gb-element-cdb458d9\">\n<h2 class=\"gb-text\"><strong><strong>Ideal for New Investors<\/strong><\/strong><\/h2>\n\n\n\n<p>AAC block manufacturing is particularly suitable if you:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Are entering the construction materials industry<\/li>\n\n\n\n<li>Have access to local sand\/fly ash resources<\/li>\n\n\n\n<li>Want a <strong>stable, long-term business<\/strong><\/li>\n\n\n\n<li>Prefer <strong>manufacturing over trading<\/strong><\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Why AAC is Attractive<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Growing demand due to green construction policies<\/li>\n\n\n\n<li>Higher margins compared to traditional bricks<\/li>\n\n\n\n<li>Lower transportation cost (lightweight product)<\/li>\n<\/ul>\n\n\n\n<p><strong>Strategic tip:<\/strong><br>Don\u2019t start by \u201cbuying machines.\u201d Start by:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Analyzing your local construction demand<\/li>\n\n\n\n<li>Identifying competitors<\/li>\n\n\n\n<li>Securing distribution channels<\/li>\n<\/ol>\n\n\n\n<p>Then design your plant accordingly.<\/p>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-048a1cd0\">\n<div class=\"gb-element-498bf7d8\">\n<h2 class=\"gb-text\"><strong><strong>ROI Analysis<\/strong><\/strong><\/h2>\n\n\n\n<p>Return on investment is where AAC projects become truly compelling.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Typical Financial Model (20,000 m\u00b3\/year)<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>M\u00e9trica<\/th><th>Value<\/th><\/tr><\/thead><tbody><tr><td>Produ\u00e7\u00e3o anual<\/td><td>20,000 m\u00b3<\/td><\/tr><tr><td>Pre\u00e7o de venda<\/td><td>$40 \u2013 $70 \/ m\u00b3<\/td><\/tr><tr><td>Annual Revenue<\/td><td>$800,000 \u2013 $1.4M<\/td><\/tr><tr><td>Operating Cost<\/td><td>50% \u2013 65%<\/td><\/tr><tr><td>Net Profit<\/td><td>$300,000 \u2013 $600,000<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Per\u00edodo de retorno do investimento<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Typical ROI period:<\/strong> 1.5 \u2013 3 years<\/li>\n\n\n\n<li>Faster in high-demand regions (Africa, Southeast Asia)<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">What Drives ROI<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Local market price<\/li>\n\n\n\n<li>Raw material cost (fly ash, cement, lime)<\/li>\n\n\n\n<li>Production efficiency<\/li>\n\n\n\n<li>Sales network strength<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-70cc7576\">\n<div class=\"gb-element-489ed9e5\">\n<h2 class=\"gb-text\"><strong><strong><strong><strong><strong>Related AAC Blocks Manufacturing Unit<\/strong><\/strong><\/strong><\/strong><\/strong><\/h2>\n\n\n\n<div class=\"gb-element-5ee15054\">\n<div class=\"gb-element-ea5637a5\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"http:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/small-AAC-plant-for-sale.jpg\" alt=\"pequena f\u00e1brica AAC de alta efici\u00eancia\" class=\"wp-image-53031\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/small-AAC-plant-for-sale.jpg 800w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/small-AAC-plant-for-sale-300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/small-AAC-plant-for-sale-768x576.jpg 768w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/09\/small-AAC-plant-for-sale-16x12.jpg 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h3 class=\"gb-text gb-text-46300dc8\"><a href=\"https:\/\/aacblockmanufacturingplant.com\/pt\/fabrica-de-blocos-de-aac-de-50000-m3-por-ano\/\">F\u00e1brica de blocos AAC de 50000 m\u00b3<\/a><\/h3>\n<\/div>\n\n\n\n<div class=\"gb-element-14fc1a16\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"http:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/12\/aac-block-machinery-manufacturers-.jpg\" alt=\"\" class=\"wp-image-53978\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/12\/aac-block-machinery-manufacturers-.jpg 800w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/12\/aac-block-machinery-manufacturers--300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/12\/aac-block-machinery-manufacturers--768x576.jpg 768w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/12\/aac-block-machinery-manufacturers--16x12.jpg 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h3 class=\"gb-text gb-text-9d81c2b1\"><a href=\"https:\/\/aacblockmanufacturingplant.com\/pt\/20000-m3-year-aac-block-plant\/\">20000 m\u00b3 AAC Block Plant<\/a><\/h3>\n<\/div>\n\n\n\n<div class=\"gb-element-fb033a79\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"http:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/12\/AAC-Block-Plant-Exported-to-Hungary.jpg\" alt=\"AAC block plant to Hungary\" class=\"wp-image-54013\" srcset=\"https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/12\/AAC-Block-Plant-Exported-to-Hungary.jpg 800w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/12\/AAC-Block-Plant-Exported-to-Hungary-300x225.jpg 300w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/12\/AAC-Block-Plant-Exported-to-Hungary-768x576.jpg 768w, https:\/\/aacblockmanufacturingplant.com\/wp-content\/uploads\/2025\/12\/AAC-Block-Plant-Exported-to-Hungary-16x12.jpg 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h3 class=\"gb-text gb-text-c915fe21\"><a href=\"https:\/\/aacblockmanufacturingplant.com\/pt\/30000-m3-year-aac-block-plant\/\">30000 m\u00b3 AAC Block Plant<\/a><\/h3>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n\n\n<div>\n<div class=\"gb-element-6ff89fa0\">\n<div class=\"gb-element-9556d936\">\n<h2 class=\"gb-text\">Start Your AAC Project with the Right Partner<\/h2>\n\n\n\n<p>If you\u2019re seriously evaluating an <a href=\"https:\/\/aacblockmanufacturingplant.com\/pt\/aac-block-manufacturing-unit\/\">AAC block manufacturing unit<\/a>, the next step is not guessing costs\u2014it\u2019s getting a <strong>customized solution based on your market<\/strong>.<\/p>\n\n\n\n<p>We help investors:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Design the right plant capacity<\/li>\n\n\n\n<li>Optimize investment structure<\/li>\n\n\n\n<li>Plan layout and equipment selection<\/li>\n\n\n\n<li>Reduce unnecessary costs from day one<\/li>\n<\/ul>\n\n\n\n<p>Tell us:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Your target capacity<\/li>\n\n\n\n<li>Your country\/market<\/li>\n\n\n\n<li>Your budget range<\/li>\n<\/ul>\n\n\n\n<p>We\u2019ll provide a <strong>tailored plant solution + detailed quotation<\/strong> to help you move forward with clarity.<\/p>\n\n\n\n<p><strong>Send your inquiry today and get a practical investment plan\u2014not just a price list.<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Complete Investment Guide Setting up an AAC (Autoclaved Aerated Concrete) block manufacturing unit is one of the most promising opportunities in the modern construction materials industry. With rising demand for &#8230; <\/p>\n<p class=\"read-more-container\"><a title=\"AAC Blocks Manufacturing Unit Cost\" class=\"read-more button\" href=\"https:\/\/aacblockmanufacturingplant.com\/pt\/aac-blocks-manufacturing-unit-cost\/#more-55077\" aria-label=\"Leia mais sobre AAC Blocks Manufacturing Unit Cost\">Ler mais<\/a><\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[],"class_list":["post-55077","post","type-post","status-publish","format-standard","hentry","category-aac-block-plant-price","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-50","no-featured-image-padding"],"_links":{"self":[{"href":"https:\/\/aacblockmanufacturingplant.com\/pt\/wp-json\/wp\/v2\/posts\/55077","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aacblockmanufacturingplant.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aacblockmanufacturingplant.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aacblockmanufacturingplant.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aacblockmanufacturingplant.com\/pt\/wp-json\/wp\/v2\/comments?post=55077"}],"version-history":[{"count":0,"href":"https:\/\/aacblockmanufacturingplant.com\/pt\/wp-json\/wp\/v2\/posts\/55077\/revisions"}],"wp:attachment":[{"href":"https:\/\/aacblockmanufacturingplant.com\/pt\/wp-json\/wp\/v2\/media?parent=55077"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aacblockmanufacturingplant.com\/pt\/wp-json\/wp\/v2\/categories?post=55077"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aacblockmanufacturingplant.com\/pt\/wp-json\/wp\/v2\/tags?post=55077"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}