200,000m3/year AAC Block Plant Exported to UAE
As a global manufacturer of AAC block production lines, we successfully exported a 200,000 m3/year fully automated AAC block plant to the United Arab Emirates (UAE). The customer is one of the fastest-growing building material suppliers in the Gulf regionโneeded a high-capacity, energy-efficient solution to meet the UAEโs rising demand for lightweight, sustainable wall materials.
The project included complete design, engineering, manufacturing, shipping, installation, and on-site commissioning.

- Destination: United Arab Emirates
- Plant Capacity: 200,000 mยณ per year
- Plant Type: Large AAC block manufacturing line
- Investment Range: USD 2,000,000 โ 3,000,000
- Application: Government housing, villa projects, warehouse construction, high-rise development
- Scope of Supply: Total turnkey solution (equipment + molds + autoclaves + commissioning + training)
Total Investment Cost for AAC Block Plant Exported to UAE?
Based on real project data:
Investment Range: USD 2,000,000 โ 3,000,000 (turnkey)
Cost Includes:
- AAC batching and mixing system
- Moulds
- Cutting line
- Autoklaf
- Steam boiler & pipeline system
- Packing and palletizing section
- Installation and training
- Spare parts package
Why AAC Block Production Is Growing Rapidly in UAE?
The UAE construction sector continues expanding in Abu Dhabi, Dubai, and Sharjah, creating strong demand for lightweight, thermally efficient, and fire-resistant wall materials.
Benefits of AAC Blocks for UAE Environment
1. Exceptional Thermal Insulation
AAC can reduce building cooling energy by 25โ30%, crucial for regions where summer temperatures exceed 45ยฐC.
2. Superior Fire Resistance
AAC meets 2โ4 hour fire resistanceโcritical for high-rise towers, shopping malls, and industrial buildings in UAE.
3. Fast Construction Speed
Larger AAC block dimensions shorten project schedules and reduce labor usage.
4. Compliance With UAE Green Building Policies
AAC is widely accepted for:
- Estidama Pearl Rating
- Dubai Green Building Regulations
- Abu Dhabi International Building Code
The UAE customer chose AAC to reduce long-term energy bills and comply with sustainability standards.
Why the UAE Client Selected Our 200,000 mยณ/year AAC Production Line?
The client compared several international suppliers and ultimately selected our solution because of the following advantages:
1. Fully Automated Line With Low Labor Requirement
The plant requires only 10โ12 workers per shift, ideal for UAEโs high labor costs.
2. Customized Layout for High Land Prices
Kami merancang sebuah compact, streamlined plant layout that reduces land use by 15โ20%.
3. Energy-Saving Autoclaving Technology
We equipped:
- Heat-recovery steam system
- Pressure optimization algorithm
- Low-consumption boiler design
This improved autoclave energy efficiency by 12โ18%, reducing operating costs.
4. Consistent Block Density & Strength
Precision cutting equipment ensures:
- Smooth block surfaces
- High dimensional accuracy
- Stable density (โค ยฑ15 kg/mยณ deviation)
5. Full Turnkey Delivery + On-Site Setup
We provided everything from plant design, equipment manufacturing, and logistics to installation and operator training.
Block Sizes Produced in the UAE Project
We configured the line to produce the most common AAC block sizes for the Gulf region:
| Block Type | Size (mm) | Usage |
|---|---|---|
| Standard wall block | 600 ร 200 ร 100 / 150 / 200 | External walls, villas |
| Partition block | 600 ร 200 ร 75 | Interior partitions |
| Load-bearing block | 625 ร 250 ร 300 | High-rise walls |
| U-shaped block | Kustom | Beam, lintel support |
| Jumbo AAC panels (optional) | 600โ900 width | Fast wall systems |
Performance of AAC Block Plant Exported to UAE

- Annual Output: 200,000 mยณ/year
- Daily Throughput: 10โ12 batches
- Cutting Cycle: 6โ7 minutes
- Autoclave Cycle: 8โ10 hours
- Workers Needed: 10โ12 per shift
Production Benefits:
- 30% faster curing
- 15% reduction in cement consumption
- 8% sand fineness optimization
- 98% equipment uptime after stabilization
On-Site Installation & Commissioning in UAE
Our technical team completed the full installation in 52 days, including:
- Equipment positioning
- Mechanical alignment
- Electrical and PLC calibration
- Cutting line debugging
- Autoclave safety testing
- Trial production
- Worker training
The plant achieved full-capacity operation in the second month.
Worker Training Included:
- Mould preparation
- Cutting precision control
- Autoclave operation & safety
- Curing and stacking techniques
- Maintenance routines
Umpan Balik Pelanggan
The UAE client reported:
- High product consistency
- Low energy consumption
- Very stable cutting accuracy
- Quick installation and responsive support
They can now supply AAC blocks to major projects in:
- Dubai
- Abu Dhabi
- Sharjah
- Ajman
- Ras Al Khaimah
The company is already planning to expand its capacity with a second line in the future.
Mengapa Memilih Kami๏ผ
- Proven Experience: Delivered AAC plants to 30+ countries, familiar with Middle East materials and standards.
- Turnkey Service: One-stop solutionโdesign, equipment supply, shipping, installation guidance, commissioning, and training.
- High Automation: Reduced labor, stable output, and improved production efficiency.
- Energy Saving: Optimized autoclave and steam systems lower operating costs in the UAE.
- Durable Equipment: High-quality steel components ensure long service life and minimal downtime.
- Fast Support: 12-hour technical response and reliable spare parts supply for long-term stable operation.

Start Your AAC Block Manufacturing Plant๏ผ
If you are planning to establish an AAC block factory in any country, we can assist with:
- Feasibility study
- Plant layout design
- Detailed cost analysis
- Production line configuration
- Installation & commissioning
- Long-term technical support
Contact us now to get your free proposal and lini produksi quotation.
Frequently Asked Questions
Q1. What is the best capacity for an AAC plant in UAE?
A 200,000 mยณ/year line offers the ideal balance between cost, demand, and ROI.
Q2. What raw materials are used for AAC in UAE?
Sand, cement, lime, gypsum, aluminum powder, and water.
Q3. How many workers are required?
10โ12 per shift for a fully automated plant.
Q4. What is the installation time?
Around 45โ60 days depending on site readiness.
Q5. Do you provide plant layout and cost analysis?
Yesโfree layout drawing, machine selection, budget calculation, and ROI estimation.