What Is an AAC Block Manufacturing Machine?
An AAC Block Manufacturing Machine (Autoclaved Aerated Concrete machine) is designed to produce lightweight, high-insulation concrete blocks. These eco-friendly blocks are fire-resistant, energy-saving, and ideal for modern green construction projects.
As global demand for sustainable materials rises, investors are increasingly searching for AAC Block Manufacturing Machine Cost to plan their production setup and maximize profitability.
AAC Block Manufacturing Machine Overview
The cost of an AAC Block Manufacturing Machine depends mainly on plant size, production capacity, automation level, and equipment configuration. Below is a general reference for different AAC plant sizes:
| Plant Size | Capacity Range (CBM/Year) | Setup Cost Range | Best For |
| Mini AAC Plant | 30,000 โ 100,000 | 100,000 to 1,000,000 USD | New investors, local markets |
| Medium AAC Plant | 100,000 โ 200,000 | 1,200,000 to 2,300,000 USD | Growing demand, regional supply |
| Large AAC Plant | 200,000- 600,000+ | 2,000,000 to 3,000,000 USD | National markets, high-volume sales |
In general, the AAC Block Manufacturing Machine cost ranges from $100,000 for a small-scale plant to around $3,000,000 for a large, fully automatic setup.
This cost includes:
- Mixing and batching systems
- Molds and cutting machines
- Autoclaves and boiler systems
- Packing, handling, and automation controls
Various Capabilities to Meet Your Needs
According to production capacity, AAC Block Manufacturing Machine can be divided into small, medium and large scale.

Mini/small AAC Block Manufacturing Machine
Capacity: 30000-100000 m3/year
Autoklaf: 1-3 sets
Factory: about 4000-10000m2
Types: semi-automatic/ fully automatic
Features: low initial investment, high flexibility.
Suitable for: Start-ups or enterprises with limited investment and small market demand.โ

Skala sederhana AAC Block Manufacturing Machine
Capacity: 100000-200000 m3/year
Autoklaf: 4-8 sets
Factory: about 10000-20000m2
Type: fully automatic
Features: stable production capacity, controllable costs, flexibility, large-scale production, etc.
Suitable for: Enterprises with a certain market share and stable demand.
Whatโs Included in the Setup Cost?
Many investors only consider machinery, but full setup requires covering every step of production. Our turn-key packages include all essential items to get you up and running:โ
- Raw Material Prep Equipment: Crushers, ball mills, and material storage systems (critical for fly ash/cement handling).โ
- AAC Production Core: Autoclaves (โ150kโ200k each), batching/mixing plants (โ50kโ80k), and cutting machines (โ75kโ100k).โ
- Support Systems: Boilers (โ30kโ50k), hydraulic conveyors (โ40kโ60k), and automated packaging lines (โ60kโ90k).โ
- Safety & Compliance: Fire safety systems, dust collectors, and low-NOx burners (to meet global emission rules).โ
- Infrastructure: Basic factory flooring, utility connections (water/electricity), and raw material storage yards.โ
- Training: On-site training for your team (in local languages) to operate equipment safely.
Hidden Costs to Include in Your AAC Plant Budget
As an experienced AAC Block Manufacturing Machine manufacturer, we understand many clients overlook critical extra costs that create budget gaps. To help you avoid this, weโre outlining the typical additional investment youโll need.
| Cost Item | Approx. (USD) | Purpose (Compliant with Global Standards) |
| Low-NOx Boiler Upgrade (โค30 mg/Nmยณ) | 120,000 | Meets EU EN 15502, US EPA, and Indian CPCB emission rules โ mandatory for most countries |
| High-Voltage Cable Trenches + Transformer Room | 80,000 | Powers our AAC production line equipment (380V/415V, 3-phase) โ designed by our electrical engineers |
| Closed-Loop Water Pool + Piping | 60,000 | Reduces water consumption by 60% (our plant design feature) โ aligns with environmental regulations |
| Fire-Fighting System & Approval | 40,000 | Complies with local fire codes (we provide fire safety drawings for approval) |
| Environmental & Building Permits | 30,000 | Covers legal paperwork (our team assists with document preparation for local authorities) |
| On-Site Erection Insurance | 20,000 | Protects our engineers and your site during installation (we arrange coverage via global insurers) |
| First-Year Spare Parts Buffer | 20,000 | Includes cutting wires, mould liners, and sensors (all manufactured in our factory โ fast replacement) |
| 1-Month Raw Material Stock | 300,000 | Cement, lime, fly-ash, and aluminum powder (we share trusted local supplier contacts to lower costs) |
Factors Influencing the AAC Block Manufacturing Machine Cost
When planning your Loji Pembuatan Blok AAC, consider these key factors that influence total cost:
- Production Capacity: Larger plants have higher upfront costs but lower per-block costs.
- Automation Level: Fully automatic lines increase efficiency but require higher initial investment.
- Raw Material Availability: Local sand, cement, fly ash, and lime prices impact total production cost.
- Land & Infrastructure: Foundation, utilities, and factory construction can affect total setup investment.
- After-Sales Service: Choosing a reliable manufacturer reduces long-term maintenance costs.
Our engineering team helps optimize every part of your setup โ from layout design to cost calculation โ to ensure maximum return on investment.
AAC Plant Proses Pembuatan
Raw material process โ Batching and Mixing โ Pouring โ Static pre-curing โ Cutting โ Autoclaving Curing โ Finished product Processing

1. Raw Material Processing: Sand is crushed and ground to the desired fineness. Cement, lime, and gypsum are stored in silos, and aluminum powder is mixed with water to form an aluminum slurry.
2. Batching and Mixing: The various raw materials are weighed according to precise proportions and then thoroughly mixed in a mixer to form a uniform slurry.
3. Pouring: The mixed slurry is poured into steel molds. The size and shape of the molds can be designed to meet the desired block specifications.
4. Static Pre-curing: The molds containing the slurry are transported to a pre-curing area where the slurry gradually hardens under suitable temperature and humidity conditions to achieve initial strength. This process typically takes several hours.
5. Cutting: After the slurry is pre-cured, it is cut into the desired size and shape using high-precision cutting equipment, steel wire or blades.
6. Autoclave Curing: Blocks are placed in an autoclave and cured for several hours at temperatures of 175-200ยฐC and pressures of 10-15 bar, significantly enhancing the blocks’ strength and durability.
7. Finished Product Processing: After autoclave curing, the blocks are removed from the autoclave and transported to a storage area. After inspection and packaging, they are ready for shipment.
Our Case: 300,000 CBM/Year AAC Block Manufacturing Machine in USA
Mr. Carter, a US construction investor, aimed to meet LEED project demand. We built a 300,000m3/year plant with US-specific tweaks: used local fly ash ($22/ton) and complied with EPA rules.
- Total setup cost: $1.8M (land in Texas: $12k/acre, energy-saving autoclaves).
- Production cost: $45/CBM, selling price: $88/CBM.
- Annual profit (80% capacity): $1.2M,
- Pay-back: ~15 months.
โThis plant cuts import reliance. We supply 8 green projects now. The teamโs OSHA training was a big plus.โ
Turn-Key Price List of AAC Block Manufacturing Machine
As a professional AAC Block Manufacturing Machine supplier, our turn-key packages cover end-to-end services with no hidden fees: full equipment manufacturing, overseas on-site erection, commissioning, operator training, and a 1-year spare parts supplyโall core services are included upfront.
Below is a detailed cost breakdown for our autoclaved aerated concrete (AAC) plants, with annual outputs ranging from 30,000 mยณ to 600,000 mยณ. We also offer fully customized solutions to match your exact annual production needs.
| Annual Output | Automation Level | Core Equipment (Manufactured In-House) | FOB China Price | Pay-Back Period |
| 30,000 mยณ | Semi-automatic | 2 ร ร2 ร 31 m Autoclaves (Our Patented Design) + Crusher + Mixer | US $280,000 | 8 months |
| 100,000 mยณ | Semi-automatic | 4 ร ร2 ร 31 m Autoclaves + Double-Shaft Mixer + Cutting Machine | US $850,000 | 10 months |
| 100,000 mยณ | Fully automatic | 4 Autoclaves + Robot Packaging System + PLC Control Panel | US $1,300,000 | 12 months |
| 200,000 mยณ | Fully automatic | 8 Autoclaves + Double Cutting Line + Steam Recovery System | US $1,900,000 | 10 months |
| 300,000 mยณ | Fully automatic | 10 Autoclaves + High-Efficiency Mixer + Energy-Saving Boiler | US $2,400,000 | 9 months |
| 600,000 mยณ | Fully automatic | 16 Autoclaves + 22h Double-Shift Configuration + Intelligent Monitoring System | US $3,800,000 | 10 months |
Calculated at 80% capacity (industry average utilization) and US $18 net profit per mยณ โ based on our global customerโs actual sales data
Why Choose Us as Your AAC Block Manufacturing Plant Manufacturer
We are a professional AAC block manufacturing plant manufacturer offering turnkey AAC production lines worldwide.
Our goal is to help you establish a profitable and reliable AAC block business with competitive pricing and full technical support.
Why global customers choose us:
โ
Factory-direct AAC Block Manufacturing Machine cost โ no middlemen
โ
Customized plant design for your target capacity
โ
Installation, training & commissioning support
โ
Long-term after-sales service & spare parts supply
โ
Proven efficiency and stable operation
We have successfully installed AAC plants across multiple countries โ helping clients achieve fast payback and consistent product quality.
Get Your Custom AAC Plant Cost Estimate
The AAC Block Manufacturing Machine Cost varies for each project based on production scale, land area, and local materials.
Tell us your requirements, and our engineers will prepare:
- A personalized cost breakdown
- A plant layout design
- A detailed quotation within 24 hours
๐ฉ Contact us now to get your free AAC plant cost analysis and quotation.
Let our experts help you build your AAC production line from concept to commissioning.
Related Autoclaved Aerated Concrete Plant
FAQ
Manufacturing (In Our 120,000 mยฒ Factory): 45โ90 days (depends on capacity)โ
Shipping: 20โ40 days (varies by destination port)โ
On-Site Installation & Commissioning:โ
- 30,000โ100,000 mยณ: 90 daysโ
- 200,000โ300,000 mยณ: 120 daysโ
- 600,000 mยณ: 150 daysโ
Timeline starts when we receive the down-payment โ we provide a detailed Gantt chart to track progress.
Absolutely. As a professional AAC plant manufacturer, we provide end-to-end training:โ
- 2 weeks of factory training in China (your team learns equipment operation)โ
- 45 days of on-site training (our engineers teach formula adjustment, quality control, and maintenance)โ
- English-language manuals (formulas for B04/B05/B06 grades, lab testing procedures, troubleshooting guides)โ
- Life-long remote support (via Teams/Zoom โ our engineers respond within 4 hours for urgent issues)
Yes. Our equipment holds CE, ISO 14001 (environmental management), ISO 9001 (quality management), GOST (for CIS countries), and SONCAP (for Nigeria) certifications. We also offer low-NOx burners (<30 mg/Nmยณ) and dust-collection systems to meet strict global regulations.
We partner with Sinosure (Chinaโs export credit agency) and Standard Chartered Bank to offer 3โ5 year equipment leases. Customers only need 15% initial cash โ perfect for reducing upfront investment pressure.
Our core equipment (autoclaves, mixers, cutting machines) has a lifespan of 15โ20 years โ thanks to high-quality steel (Q345R for autoclaves) and precision manufacturing. We also offer a 5-year warranty on major components.







